After inspection from the mitigation team, the team determined that the hot water heater leak affected the living room, bathroom, 3 closets, kitchen, and dining room in the home. The team completed necessary demolition and placed 9 air movers and 2 dehumidifiers. The mitigation team monitored the equipment until all drying goals were ...

Warren V.

November 30, 2021 | Peachtree City, GA

After inspection from the mitigation team, they found that the backup affected the bath, laundry room, kitchen, and living room. The plumbers were onsite working to fix the blockage. The team completed necessary demolition to the drywall and floors, then placed a dehumidifier, air scrubber, and 4 air movers to begin ...

Josette C.

November 28, 2021 | Sharpsburg, GA

After inspection from the mitigation team, the team determined that the master tub was the source of the leak. They removed the affected drywall, insulation, and carpet pad. The team set 4 air movers and 1 dehumidifier and monitored the equipment until all drying goals were met. The PENCO team worked with ...

Beverly P.

November 24, 2021 | Fayetteville, GA

After inspection from the mitigation team, they determined that the washing machine filter did break and affected the laundry room, activity room, and closet, as well as a tile bathroom, carpeted hallway, and concrete utility closet. The laundry room cabinets were also affected and were detached. The team placed 11 air ...

Khoshkam M.

November 16, 2021 | Acworth, GA

The mitigation team proceeded to complete necessary demolition in the bathroom, which included flooring and trim. The team then set four air movers and 1 dehumidifier to begin drying the space. The mitigation team monitored the equipment until all drying goals were met. The PENCO team worked with the homeowner's insurance ...

Sharon T.

November 15, 2021 | Fairburn, GA

The mitigation team proceeded to complete necessary demolition to both levels of the home and set five air movers and 2 dehumidifiers in both the kitchen and the master bathroom. The mitigation team monitored the equipment until all drying goals were met. The PENCO team worked with the homeowner's insurance company ...

Sharon T.

November 15, 2021 | Fairburn, GA

After inspection from the mitigation team, they determined that the master bathroom was affected, along with the kitchen and living room on the main level. The team completed necessary demolition (removing baseboards and flooring) and placed 5 air movers and 2 dehumidifiers. The mitigation team monitored the equipment until all drying goals ...

Dennis R.

November 8, 2021 | Newnan, GA

After inspection from the mitigation team, they determined that the septic line did in fact cause the damage. It affected the bath, den, hall, and the utility area. They removed the drywall, flooring, and insultation in the affected areas. The team then set 9 air movers, and air scrubber, and 1 dehumidifier ...

MaryAnn H.

November 4, 2021 | Fayetteville, GA

After inspection from the mitigation team, the team determined that the damage was caused from the supply line and placed a dehumidifier in the garage. The team returned the next day to complete necessary demolition for the mitigation. They placed 7 air movers and 2 dehumidifiers to dry the affected areas. The ...

Leslie H.

November 2, 2021 | Sharpsburg, GA

After inspection from the mitigation manager, he determined the ice maker supply in wall had leaked affecting the kitchen, laundry room, and master closet. The kitchen and closet cabinets were both swollen as well. The mitigation team proceeded to complete necessary demolition, which included kitchen cabinets, affected hardwoods, and carpet. ...

Thomas D.

October 28, 2021 | Sharpsburg, GA

After inspection from the mitigation team, they proceeded to remove the affected carpet pad from the master bedroom and closet, as well as the hardwoods in the foyer. The team also had to cut into the drywall in the master closet in order to get airflow under the stairs in ...

L.K.

October 25, 2021 | Moreland, GA

The mitigation manager proceeded to meet with National Environmental Solutions (NESI) at the home in order to perform protocol air sampling, which found that there were elevated levels of mold spores in the crawlspace. NESI gave PENCO the protocol and the team completed remediation. Then NESI came back onsite in ...

Holly A.

October 25, 2021 | Newnan, GA

After inspection from the mitigation team, they determined that the overflow was caused by a faulty fill valve on the toilet. They proceeded to complete necessary demolition to both levels of the home and set eight air movers and 2 dehumidifiers in the space. The mitigation team monitored the equipment until ...

Bonnie T.

October 23, 2021 | Sharpsburg, GA

Upon inspection from the mitigation team, they found that the master bathroom sink supply line was the source of the water loss. The team completed necessary demolition in the affected areas of the home, which included removing the engineered hardwood floors. There were 37 air movers placed, as well as 4 dehumidifiers. ...

Carol H.

October 21, 2021 | Newnan, GA

After inspection from the mitigation manager, he found a corner of their kitchen ceiling that was wet. The affected insulation was removed and two air movers and 1 dehumidifier were placed for drying. The mitigation team monitored the equipment until all drying goals were met. The PENCO team worked with the ...